Fort Sam
Renovation of the West Wing Historical Building 16
Statement of Work: Scope of Work: AMG successfully designed the structural shoring and demo of an interior rock rubble wall that was 2 feet thick. The span of this structural reinforcement proposed several challenges. AMG rose to the challenge and successfully provided exceptional quality of finished work. Additionally, within this scope, AMG successfully gutted and fully remodeled the interior of the four bays (141-144) and built a new Audio Visual closet in bay 140. Access flooring throughout included an exceptional finish of stained concrete, with a stainless steel metal border. Our team successfully managed the installation of modular glass walls and FF&E that is also of exceptional quality. The AMG team also coordinated very well with assisting the separate Audio Visual contractor, to ensure they completed their success.
Contract Completion: August 2020
Contract Amount: $6,049,654.00
Contract #: W9126G-16-C-0074
Fort Sam
Renovation of Building 16 West Wing
Performance Evaluation: AMG received an “exceptional rating” for project management and safety on this project. We received a “very good” rating for quality control, schedule and regulatory compliance.
Statement of Work: This project included renovating nearly the entire west wing of building 16. AMG successfully gutted the entire area and framed interior load bearing walls with offices, a telecommunications room and an audio visual room. This project was an ICD-705 accredited project.
Contract Completion: March 2019
Contract Amount: $5,570,000.00
Contract #: W9126G-15-C-0103
Fort Sam
AR NORTH Headquarters
Performance Evaluation: AMG received an “Exceptional” rating for project management, regulatory compliance and safety on this project. We also received a “Very Good” rating for quality control and schedule.
Statement of Work: Building 4196- demolition of offices and renovation to include metal stud partitions, HVAC, electrical, Fire Suppression, interior finishes and interior security cages. Building 2186- Installation of a funeral honors pavilion. This scope included site work, structural concrete, steel erection, roofing and electrical. Building 4203- Included interior renovation to include intrusion detection system (IDS), access control (Card readers and programming), electrical and misc. finishes. Building 2001- Renovation of an existing building to convert it into a SCIF.
Contract Completion: February 16, 2018
Contract Amount: $3,047,798
Contract #: W9126G-15-C-0104
Lackland
Lackland Paving – Ambulatory Care Center Phase 3
Performance Evaluation: AMG received an “above average” on our CPARS evaluation for quality, schedule and management on this project. The allotted time was very aggressive and AMG rose to the challenge completing this one on time and within budget. Our evaluation for schedule states: “Several change orders were issued and Contractor worked proactively to sequence activities so delays were minimized.” Our very good rating for quality states: “Contractor did a good job in ensuring the correct materials were used and recommended several no-cost changes for approval to produce a higher quality product.”
Statement of Work: The project scope included; earthwork, site concrete, asphalt paving, electrical and landscaping to pave a new road between Wilford Hall and the ACC hospital.
Contract Completion: November 2018
Contract Amount: $1,264,662.00
Contract #: W9126G-17-C-0020
Corpus Christi Army Depot
HVAC Upgrades, Building 1880
Statement of Work: AMG successfully completed the Mechanical retrofit/upgrade of the system in building 1880 on the Naval Air Station in Corpus Christi. This project also included electrical upgrades and interior finish improvements (e.g. suspended ceiling replacement, paint, etc.).
Contract Completion: May 2017
Contract Amount: $390,892.00
Contract #: W9126G-15-C-0078
Fort Hood
Operational Readiness Training Complex
Statement of Work: Design-build consisting of two (2) four story barracks, one (1) officers’ quarters building, and one (1) battalion headquarters building.
Contract Completion: November, 2016
Contract Amount: $42,807,624.00
Contract #: W9126G-12-C-0043
Fort Sam
Renovation of Building 905
Performance Evaluation: AMG Contractors received a “very good” rating on Quality, Management, Regulatory Compliance and Safety.
Statement of Work: Full renovation of four (4) three story buildings that make up building 905
Contract Completion: April 25, 2016
Contract Amount: $6,241,000.00
Contract #: W9126G-14-D-0002
Lackland AFB
MWD Kennels
Performance Evaluation: AMG received an “Exceptional” rating for Cost Control and a “Very Good” rating for Quality, Schedule, Project Management, Regulatory Compliance, and Safety.
Statement of Work: AMG successfully completed a challenging design-build project of installing new solar heat screens, bird netting and structural steel reinforcement on 23 dog kennel buildings at Lackland Airforce base training facility.
Contract Completion: September 25, 2015
Contract Amount: $1,718,303.00
Contract #: W9126G-14-C-0097
Fort Hood
Repair Recycle Center Facility Bldg. 4621
Statement of Work: Project included various repairs to building 4621 consisting of relocating fire alarm pull boxes, vertical relocation of NG gas line, roof repair cost analysis, partial paving replacement. In addition AMG constructed two (2) in-floor conveyor pits and subsequently installed new single stream conveyor equipment.
Contract Completion: August 19th, 2016
Contract Amount: $3,485,667
Contract #: W9126G-15-C-0004
Corpus Christi Army Depot
Hangar 43
Statement of Work: Scope of work consist of construction renovations of over 15,000 Square Feet of Hanger 43, which included lead and asbestos abatement, Structural steel erection, metal stud framing, finishes for offices, erections of flyovers, roofing, lighting, mechanical and distribution of power generation.
Contract Completion: June 30, 2017
Contract Amount: $8,377,225
Contract #: W9126G-14-D-0002-0002
Randolph AFB
Renovate B902 3rd Floor East Wing
Statement of Work: Project consisted of a complete renovation of the 2nd floor east wing of building 902 to include a full interior gut followed by metal stud framing, drywall, and all interior finishes. Scope also included an entire HVAC retrofit to the east wing and electrical upgrades.
Contract Completion: December 20, 2015
Contract Amount: $1,618,926.00
Contract #: W9126G-14-C0-0108
Lackland AFB
Building 2000 & 2007 (Security Hill)
Statement of Work: Design-build project involving the remodel of over 20 offices, building a CMU dumpster enclosure, erected a metal hard stand walkway and installed brick paving.
Contract Completion: June 14, 2013
Contract Amount: $2,358,163
Contract #: W912BV-11-C-0035
Corpus Christi Army Depot
Hangar 44 & 43
Statement of Work: Project consisted of renovation and repair of Hanger 43 & 44 roof. Removed and replaced 99,470 sf of EPDM low sloped (flat) roofing for Hanger 43. Project also included demolition and installation of a compass calibration pad for Hanger 44.
Contract Completion: August 8th, 2013
Contract Amount: $1,881,142
Contract #: W9126G-12-C0099
Camp Bullis
Supporting Medical Facilities
Statement of Work: Project consisted of engineered concrete slab and erection of a pre-engineered metal clear span canopy structure with a standing seam metal roof.
Contract Completion: November 7, 2011
Contract Amount: $1,200,000
Contract #: W9126G-11-C-0004